Effective Date: December 8, 2025
Where: Cooking Lake-Blackfoot PRA
Details:
Middle Trail enables several loops of varying lengths to be made in the Islet Lake area.
| Open | |
| Length | 1.3 km |
| Summer |
|
| Winter |
|
| Trailheads |
|
| Trail Map |
Cooking Lake-BlackfootWinter Trail Map
Cooking Lake-BlackfootWinter Trail Tear Sheet Summer Trail Map |