Trail | Length | Season | Permitted Activities (Legend) | Status |
---|---|---|---|---|
1982 Canadian Mount Everest Expedition Interpretive
May 16th: A couple small patches of snow. Downed trees removed |
2.1 km | Summer Only |
![]() |
Open |
Bill Benson
May 13th: Trail free of snow, and cleared of needles and debris. |
0.7 km one-way | Summer Only |
![]() |
Open |
Black Prince Cirque Interpretive
April 30th: Wet with snow patches down lower, lots of snow near and at the lake. Note: The Blackshale Creek Suspension Bridge is NOT accessed from this trail. |
4.2 km | Summer Only |
![]() |
Open |
![]() Tracks are shallow in some places. Groomed only from Elk Pass to Fox Creek. |
2.2 km one-way | Winter Only |
![]() ![]() |
Open |
Braille | 2.2 km | Winter Only |
![]() |
Open |
Burstall Pass
April 30th: Mainly deep snow. Note: Bikes permitted on first 2.9 km of trail ONLY. |
7.4 km one-way | Summer Only |
![]() ![]() |
Open |
Burstall Pass (Backcountry) | km | Winter Only |
![]() |
Open |
Chester Lake
Chester Lake: Snow covered. Annual closure in place for Chester Lake until Jun 29 to allow area to dry and prevent damage to trail. |
4.6 km one-way | Summer Only |
![]() ![]() ![]() |
Closed |
Elbow Lake
April 29th: Snowbound. Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
1.4 km one-way | Summer Only |
![]() ![]() ![]() |
Warning |
Elk Pass
May 10th: A mix of snow and bare ground with muddy sections. Sign changeover complete. |
5.6 km | Summer Only |
![]() ![]() |
Open |
Highwood Meadows
Closed for construction Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.6 km one-way | Summer Only |
![]() |
Closed |
Kananaskis Canyon Interpretive
Closed: Stream crossings washed away by penstock/dam construction. Trail is impassable and is closed indefinitely. |
0.8 km | Summer Only |
![]() |
Closed |
Lookout
April 29th: Likely a mix of bare and snow covered. Sign changeover complete. |
1.7 km | Summer Only |
![]() ![]() |
Open |
Lower Lake Interpretive
May 14th: Snow free. Blown free of needles and debris. Downed trees removed. |
0.5 km one-way | Summer Only |
![]() |
Open |
Maude-Lawson
April 29th: Deep snow. Note: This trail has been redirected just west of Forks for access to Turbine Canyon. |
7.5 km | Summer Only |
![]() |
Open |
![]() Trackset from Elkwood to the Visitor Centre on April 9th. The remainder was trackset on April 2nd. |
4.0 km | Winter Only |
![]() |
Open |
Peter Lougheed Paved
May 16th: Swept and blown free of needles and debris. A few patches of snow and ice remain on trail edges. Sign changeover complete. |
12.1 km one-way | Summer Only |
![]() ![]() |
Open |
Pocaterra
April 29th: Bare at lower elevations and partly snow covered at higher elevations. Sign changeover complete. Note: This is not the undesignated Pocaterra Ridge or Cirque route. |
9.9 km one-way | Summer Only |
![]() ![]() |
Open |
Ptarmigan Cirque Interpretive
April 29th: Snowbound Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
4.5 km | Summer Only |
![]() |
Warning |
Rawson Lake
May 20th: Trail is muddy in the lower half, and packed snow/ice on the upper half. Deep snow cover at the lake. |
3.9 km one-way | Summer Only |
![]() |
Open |
Rock Glacier Interpretive
Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.15 km one-way | Summer Only |
![]() |
Warning |
Rockwall
May 16th: Blown free of needles and debris. Closed for bear activity. |
0.5 km | Summer Only |
![]() |
Closed |
Rolly Road Training Grid
Six sets of tracks set.
|
km | Winter Only |
![]() |
Open |
![]() May 14th: Swept and blown free of needles and debris. A few patches of snow and ice remain on trail edges. Sign changeover complete. |
0.8 km | Winter Only |
![]() ![]() |
Open |
![]() May 12th: Snow free between Interlakes and Point campground junction. Trail not observed beyond Point junction. Note: Bikes only permitted to Invincible Creek, 3.8 km from trailhead |
10.2 km | Summer Only |
![]() ![]() |
Open |
Upper Lake
May 28th: Snow free between Interlakes and Point campground junction and from North Interlakes to Upper Lake. The rest of the trail may be wet with some snow patches. Lots of downed trees that must be navigated. |
15.7 km | Summer Only |
![]() ![]() |
Open |
Whiskey Jack
May 2nd: A mix of bare and some snow patches with muddy sections. Sign changeover complete. |
3.9 km one-way | Summer Only |
![]() ![]() |
Open |
William Watson Lodge Access
May 14th: Swept and blown clean of needles and debris. Sign changeover complete. |
0.6 km one-way | Year-Round |
![]() ![]() ![]() |
Open |
Peninsula
May 16th: Snow free. Downed trees removed. |
0.4 km | Summer Only |
![]() |
Open |
Tailwater Snowshoe | 1.9 km | Winter Only |
![]() ![]() ![]() |
Open |
Frozen Toad Loop Snowshoe | 8.1 km | Winter Only |
![]() ![]() ![]() |
Open |
Torpor Loop | 6.1 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
South Sawmill Loop | 2.8 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
William Watson Lodge Connector
May 6th: Mainly snow covered. Sign changeover complete. |
0.7 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
Boulton Creek Interpretive
May 29th: Sign changeover complete. Downed trees removed. |
4.9 km | Summer Only |
![]() |
Open |
Marl Lake Interpretive
May 27th: The path is clear of debris and snow. |
1.5 km for loop | Summer Only |
![]() |
Open |
Lower Lake
May 14th: Mainly bare with a couple snow patches at the north end. |
3.5 km one-way | Summer Only |
![]() |
Open |
High Rockies (Winter)
Note: Between Nov. 1 and May 1 the trail is closed through the Buller Slide Path due to Highway Avalanche Control. |
63.0 km Goat Creek to Peninsula Day Use | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
High Rockies (Summer)
May 15th: Mainly snow covered between Sawmill to Black Prince and north of Buller. The remainder is a mix of bare with snow patches. Note: Hiker-cyclist camping allowed at select day use areas only from Jun 1 - Sep 20. See details. |
63.0 km Goat Creek to Peninsula Day Use; 80.0 km Goat Creek to Elk Pass | Summer Only |
![]() ![]() ![]() |
Open |