The Wheeler cross-country ski trail utilizes a portion of the Paved Path in PLPP to connect Elkwood and Boulton. The trail provides some impressive views of meadows and distant mountains to the south.
Open | |
Trackset North and South of the Amos junctions on April 13th. The remainder was trackset on April 9th and will have quite a few bare spots. Tracks are thin in sun exposed areas. |
|
Groomed: Apr 13 Track Set: Apr 13 | |
Length | 4.7 km |
Difficulty |
![]() |
Summer | |
Winter |
![]() |
Trailheads |
|
Trail Map |
Peter Lougheed PP - Kananaskis Lakes Ski Trails Map
Peter Lougheed PP - Winter Trails |
Trail Report: | Peter Lougheed |